Preview

Nuclear Physics and Engineering

Advanced search

EQUIPMENT FOR MEASURING THE KICK STRENGTH OF THE EXTRACTED BUNCH INTO THE APERTURE OF THE SEPTUM MAGNET SM24 AT U-70 ACCELERATOR

https://doi.org/10.56304/S207956292502006X

EDN: PVYFAL

Abstract

A prototype equipment for measuring the radial position of the chosen proton bunch upstream of the septum magnet SM24 during the fast extraction at IHEP. The double measurement, made immediately before and at the time of the extraction, allows us to determine the amount of the kick strength into the aperture of the septum magnet with RMS deviation of less than 0.5 mm. In this presentation the equipment is reviewed and the results of a test in real conditions are presented.

About the Authors

E. A. Syshchikov
National Research Centre “Kurchatov Institute” – IHEP
Russian Federation


I. V. Ivanova
National Research Centre “Kurchatov Institute” – IHEP
Russian Federation


V. I. Terekhov
National Research Centre “Kurchatov Institute” – IHEP
Russian Federation


References

1. Комаров В.В., Курнаев О.В., Меркер Э.А. и др. Система быстрого вывода протонов из ускорителя на 70 ГэВ. Препринт 72–98. 1972. Серпухов: ИФВЭ.

2. Афонин А.Г., Дианов В.И., Максимов А.В. Оптимизация схемы вывода протонного пучка из У-70. Препринт 92-121. 1992. Протвино: ИФВЭ.

3. Cuperus J., Fabiani F., Kamber I., Nuttall J. // IEEE Trans. Nucl. Sci. 1973. V. 20 (3) P. 523–527. https://doi.org/10.1109/TNS.1973.4327167


Review

For citations:


Syshchikov E.A., Ivanova I.V., Terekhov V.I. EQUIPMENT FOR MEASURING THE KICK STRENGTH OF THE EXTRACTED BUNCH INTO THE APERTURE OF THE SEPTUM MAGNET SM24 AT U-70 ACCELERATOR. Nuclear Physics and Engineering. 2025;16(3):287-291. (In Russ.) https://doi.org/10.56304/S207956292502006X. EDN: PVYFAL

Views: 3


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2079-5629 (Print)
ISSN 2079-5637 (Online)